Nashville and Middle Tennessee
Master Plans and Phased Projects in Nashville and Middle Tennessee
Design, Planning and Care

Master Plans and Phased Projects

A complete master plan for your property that can be built in phases, with each phase designed to look and work as finished.

Not everyone wants to build the whole yard at once. A master plan shows the whole picture, with patios, walls, kitchen, fire and planting, and divides it into phases that fit your budget and your calendar. Each phase is designed to look finished by itself, and the plan keeps later phases from being blocked by earlier ones. Nashville owners use master plans to spread projects over several seasons.

The designer creates a master plan with all features and divides the work into logical phases. Utilities, drainage, grading and conduit that serve later phases are planned and installed early, which saves digging up work. The crew builds one phase at a time, and the plan is updated if your needs change. The scope lists each phase and its sequence. Phasing works best when each stage has a clear purpose. We suggest starting with infrastructure and the feature that you will use most, such as the main patio or kitchen, and then adding structures, planting and extras. A written plan lists each phase with its scope and sequence, and you can decide to move forward at your own pace. Because the master plan is drawn first, later phases fit together without tearing up finished work. We also discuss how to keep the yard comfortable between phases, with temporary planting, mulch or lighting.

See the whole picture

A master plan shows how every piece fits, so the first phase supports the last.

Plan the hidden work

Drains, conduit, gas and water lines for later phases go in early, so you do not tear up finished work.

Phases that look complete

Each phase includes the planting and finishing details so the yard looks cared for in between.

Flexible plan

If your needs change, the plan can be adjusted without losing the overall design.

What is included

  • Master plan drawing
  • Priority setting
  • Phase breakdown
  • Early infrastructure
  • Phase construction
  • Review and updates
Before and after

See the transformation.

Drag the handle to compare.

After: a back yard with the same yard with a paver patio, a pergola, a fire pit, seat walls, layered planting and string lightsBefore: a back yard with a bare, muddy back yard behind a suburban house with patchy grass, a small concrete stoop, a plain fence and no shadeBeforeAfter
A bare, muddy back yard turned into an outdoor living room. From a bare, muddy back yard behind a suburban house with patchy grass, a small concrete stoop, a plain fence and no shade to the same yard with a paver patio, a pergola, a fire pit, seat walls, layered planting and string lights.
Why it works

What you get with Master Plans and Phased Projects

Draw the master plan

Full vision created.

Set priorities

Order agreed.

Divide into phases

Stages planned.

Install hidden infrastructure

Drains and conduit placed.

Build phase one

First stage completed.

Review and continue

Next stage scheduled.

Try it now

Patio and Outdoor Living Budget Planner

Pick a patio, deck, kitchen, fire pit, wall or lighting job, set the size and add extras to see a ballpark planning range. Placeholder values only.

How it works

Our process, start to finish.

  1. 01

    Call and describe your yard

    You tell us how you want to use your outdoor space. One call sets up a visit that fits your day.

  2. 02

    Walk and measure

    A designer walks the yard, measures, notes slope, drainage, sun, trees and utilities and listens to your goals.

  3. 03

    Design and approve

    You see a layout, materials and a written scope with the base, drainage, structures and schedule before anything begins.

  4. 04

    Mark utilities and prepare the base

    Utility marking is requested, the area is excavated and a compacted stone base and drainage are built first.

  5. 05

    Build and finish

    Surfaces, walls, structures and features are built in a clear order, with checks and photos along the way.

  6. 06

    Walk through and enjoy

    The site is cleaned up, the space is explained on a walk-through and care tips are shared.

Questions

Master Plans and Phased Projects FAQ

Why phase a project?

To spread cost and effort over time while keeping a clear design.

What gets built first?

Usually drainage, grading and the main surface, then structures and features.

Will phases look unfinished?

No, each phase is planned to be complete with finishing details.

Can I change the plan?

Yes, and we update the master plan.

How long do phases take?

It depends on size, and we give a schedule for each.

Next step

Get your Free Estimate for Master Plans and Phased Projects.

Tell us about your yard and one designer will call you back to set up a visit.

Or call (615) 431-3789 to talk now.

Tell us about your yard

One designer will call you back to talk it through and set up a visit.

Prefer to talk? Call (615) 431-3789. We never sell your information.

CallFree Estimate