Nashville and Middle Tennessee
Elevated and Second-Story Decks in Nashville and Middle Tennessee
Decks, Porches and Walkways

Elevated and Second-Story Decks

Tall decks off upper floors and sloped lots, with engineered posts, bracing, stairs and railings built for safety and good looks.

Many Nashville homes sit on hillsides, with the main floor well above the back yard. An elevated deck gives you a view and a way outside from upstairs rooms, and it can create covered space below. Because these decks are tall, their structure, bracing and railings carry more responsibility, and careful design is what keeps them safe and solid.

Your designer checks the house structure, the ledger attachment points and the soil, and plans posts, beams, bracing and footings for the heights and loads. The crew installs flashing and ledger hardware, builds the frame, adds lateral bracing and stair stringers and finishes with decking and railings. The scope also notes any space under the deck, such as a drainage ceiling for a dry lower patio.

Taller needs stronger

Higher decks need larger posts, bracing and connections, and we design them with the loads and wind in mind.

Ledger safety

The ledger is the most important attachment, and proper flashing, bolts and inspection keep it secure and dry.

Stairs and railings

Tall decks need stairs with comfortable risers and railings with strong posts, and we plan the landings and sightlines.

Dry space below

A drainage ceiling can turn the area under a deck into a dry patio or storage space.

What is included

  • House and soil review
  • Engineering-minded design
  • Ledger and flashing
  • Posts, beams and bracing
  • Decking and railings
  • Stairs and landings
Before and after

See the transformation.

Drag the handle to compare.

After: a back deck with the same deck rebuilt with clean composite boards, a straight railing, tidy stairs and warm evening lightBefore: a back deck with a weathered gray wood deck with splintered boards, a wobbly railing, rusted screws and green algae in the shaded cornersBeforeAfter
A gray, splintered deck rebuilt in composite with new railings. From a weathered gray wood deck with splintered boards, a wobbly railing, rusted screws and green algae in the shaded corners to the same deck rebuilt with clean composite boards, a straight railing, tidy stairs and warm evening light.
Why it works

What you get with Elevated and Second-Story Decks

Inspect the house

Attachment and soil reviewed.

Design the structure

Posts, beams and bracing set.

Install flashing and ledger

Attachment completed.

Frame and brace

Structure built.

Decking, railings and stairs

Surface and safety details.

Optional drainage ceiling

Dry space created below.

Try it now

Patio Condition and Repair Checker

Pick the surface, its age and the signs you see to learn how worn it is and whether to clean, repair, resurface or replace.

How it works

Our process, start to finish.

  1. 01

    Call and describe your yard

    You tell us how you want to use your outdoor space. One call sets up a visit that fits your day.

  2. 02

    Walk and measure

    A designer walks the yard, measures, notes slope, drainage, sun, trees and utilities and listens to your goals.

  3. 03

    Design and approve

    You see a layout, materials and a written scope with the base, drainage, structures and schedule before anything begins.

  4. 04

    Mark utilities and prepare the base

    Utility marking is requested, the area is excavated and a compacted stone base and drainage are built first.

  5. 05

    Build and finish

    Surfaces, walls, structures and features are built in a clear order, with checks and photos along the way.

  6. 06

    Walk through and enjoy

    The site is cleaned up, the space is explained on a walk-through and care tips are shared.

Questions

Elevated and Second-Story Decks FAQ

Does a tall deck need an engineer?

Many tall decks benefit from engineering or a permit review, and we help you prepare. You confirm with your local office.

How do you attach a deck to a hillside house?

With a flashed, bolted ledger or freestanding posts, depending on the structure and site.

Can I make a dry area under my deck?

Yes, with a drainage system under the decking, which creates a usable patio below.

Are railings required?

Decks above a set height need railings, and we follow the rules and the look you want.

How long does it take?

Taller decks take longer than low ones, often a few weeks including approvals.

Next step

Get your Free Estimate for Elevated and Second-Story Decks.

Tell us about your yard and one designer will call you back to set up a visit.

Or call (615) 431-3789 to talk now.

Tell us about your yard

One designer will call you back to talk it through and set up a visit.

Prefer to talk? Call (615) 431-3789. We never sell your information.

CallFree Estimate